For any Project, testing activity will be there from starting onwards, After the Requirements gathering, Design Document (High and Low) will be prepared, that will be tested, whether they are confirming to requirements or not, Design then Coding- White box will be done, after the Build or System is ready, Integration followed by functional testing will be done, Till the product or Project was stable. After the product or project is stable, then testing will be stopped.